Hi Team, I need to execute an endurance test in Azure Load Testing (ALT) for a duration of 48 hours. However, I’m unable to configure the test duration beyond 24 hours in the current settings.

Could you please help me with the required steps or configuration changes to enable a 48-hour test run?